Renovations to Broadway Pier, San Diego, CA: Structural rehabilitation
involving the demolition and reconstruction of Broadway Pier. The concrete
berthing pier was built in 1913 to 825’ x 130’ wide dimensions with a 1930
extension of 200’. We provided above and below water inspections, structural
design for demolition and reconstruction of the pier to accommodate vessels
800’ in length.
-
Pier J-K, NAS North Island, San Diego, CA: Reconstruction of 800’ long
concrete pier structure involving new prestressed piles, cast-in-place
concrete deck, wood fender system and all new utility systems.
-
Crystal Pier Extension & Repair, City of San Diego, Pacific Beach, CA:
Design of 240 LF extension of wood pier with water and electrical utilities.
-
Piers 159, 160, 169 and 302 Repairs, Naval Ocean Systems Center, Point
Loma, CA: Structural steel, timber and concrete repairs to existing pier and
float structures. Pile jacketing and new pile installation was included.
-
Dredge Main Channel from Pier 7 to Coronado Bridge, San Diego Bay, San
Diego, CA: Prime design A&E for dredging to 37’ MLLW, beach replenishment and
environmental documentation and permitting.
-
Repair Quaywall between Piers 1 and 2, Naval Station, San Diego, CA: Prime
A&E design for new absorbing fender system, new concrete & steel quaywall,
waterfront construction management and construction strategy to maintain
active berthing for the Fleet during construction.
-
Repair and Upgrade to Fuel Berthing Pier, Point Loma, San Diego, CA: Prime
A&E design including above and below water inspections, new energy absorbing
fender system, concrete repairs to existing pier and waterfront construction
management / construction strategy to maintain fueling operations during
construction.
|